通風管道設備安裝的規(guī)范細則
發(fā)布人:http://rdhw.com.cn 發(fā)布時間:2020-05-20 14:32:52
通風是一種換氣設備,它是用機械或自然的方法向室內空間送入足夠的新鮮空氣,同時把室內不符合衛(wèi)生要求的污濁空氣排出,使室內空氣滿足衛(wèi)生要求和生產過程需要,通風管道設備有著十分廣泛的使用范圍。下面小編就來為大家介紹一下通風管道設備安裝的規(guī)范細則以及常見問題。
Ventilation is a kind of ventilating equipment, it uses mechanical or natural methods to send enough fresh air to the indoor space, and at the same time, it discharges the dirty air that does not meet the sanitary requirements, so that the indoor air can meet the sanitary requirements and the needs of the production process. The ventilation pipe equipment has a very wide range of use. The following small edition will introduce the specification details and common problems of the installation of ventilation pipeline equipment for you.
當今,建筑中完成通風工作的各項設施,統(tǒng)稱通風管道設備。通風管道設備分排風扇,換氣扇,風機等,又分工業(yè)用及家用二種。而風機又分高、中、低、負壓等。
Nowadays, the ventilation facilities in the building are collectively referred to as ventilation pipe equipment. The ventilation duct equipment is divided into exhaust fan, ventilation fan, fan, etc., and is divided into industrial and household two kinds. And the fan is divided into high, medium, low, negative pressure and so on.
通風管道設備安裝的規(guī)范細則
Specification for installation of ventilation pipeline equipment
1、通風機安裝應符合下列規(guī)定
1. The fan installation shall meet the following requirements
(1)風機試運轉時,葉輪旋轉方向正確,經不少于2H運轉后,滑動軸承溫升不超過35度,溫度不超過70度;滾動軸承溫升不超過40度,溫度不超過80度。
(1) During the test run of the fan, the rotating direction of the impeller is correct. After not less than 2h of operation, the temperature rise of the sliding bearing shall not exceed 35 degrees and the maximum temperature shall not exceed 70 degrees; the temperature rise of the rolling bearing shall not exceed 40 degrees and the maximum temperature shall not exceed 80 degrees.
(2)離心風機與減震臺座接觸緊密,螺栓擰緊,并有防松裝置。
(2) The centrifugal fan is in close contact with the shock absorption pedestal, the bolts are tightened, and there is a locking device.
(3)管道風機采用減震吊架安裝時,風機與減震吊架連接緊密,牢固可靠;采用支拖架安裝時,風機與減震器及支架、托架連接緊密,穩(wěn)固可靠。
(3) When the pipeline fan is installed with damping hanger, the connection between the fan and damping hanger is tight, firm and reliable; when it is installed with support and towing frame, the connection between the fan and shock absorber, bracket and bracket is tight, firm and reliable.
2、過濾器、紙除塵器、過濾器吸收器安裝應符合下列規(guī)定
2. The installation of filter, paper dust remover and filter absorber shall meet the following requirements
(1)各種設備的型號、規(guī)格、額定風量必須符合設計要求。
(1) The model, specification and rated air volume of various equipment must meet the design requirements.
(2)各種設備的安裝方向必須正確。
(2) The installation direction of various equipment must be correct.
(3)設備與管路連接時,宜采用整體性的橡膠軟管接頭,并不得漏氣;固定支架應平正穩(wěn)定。
(3) When the equipment is connected with the pipeline, the integral rubber hose joint should be used without air leakage; the fixed bracket should be flat and stable.
(4)過濾器的安裝應固定牢固,過濾器與框架、框架與維護結構之間無明顯縫隙。
(4) The installation of filter shall be fixed firmly, and there shall be no obvious gap between filter and frame, frame and maintenance structure.
(5)紙除塵器和過濾器的安裝,應固定牢固,位置準確,連接嚴密。
(5) The installation of paper dust remover and filter shall be fixed firmly, with accurate position and tight connection.
3、消聲器安裝應符合下列規(guī)定
3. The installation of muffler shall meet the following requirements
(1)消聲器框架必須牢固,共振腔的隔板尺寸貼緊,正確,隔板與壁板結合處外殼嚴密不漏。
(1) The muffler frame must be firm, the diaphragm size of the resonance chamber shall be close and correct, and the shell at the joint of diaphragm and wall plate shall be tight without leakage.
(2)消聲器安裝方向必須正確,并單獨設置支(吊)架。
(2) The installation direction of muffler must be correct, and the support (hanger) shall be set separately.
(3)消聲片單獨安裝后固端必須牢固,片距均勻。
(3) The fixed end of the silencing piece shall be firm and the distance between pieces shall be even after it is installed separately.
(4)消聲片狀材料粘結牢固、平整,散狀材料充填均勻、無明顯下沉。
(4) The anechoic sheet material is firmly and smoothly bonded, and the scattered material is evenly filled without obvious sinking.
(5)消聲復面材料順氣流方向拼接,無損壞;穿孔板無毛刺,孔距排列均勻。
(5) The material of noise elimination compound surface is spliced along the air flow direction without damage; the perforated plate is free of burr and the hole spacing is evenly arranged.
4、密閉閥門安裝,應符合下列規(guī)定
4. The installation of airtight valve shall meet the following requirements
(1)安裝前應進行檢查,其密閉性能應符合產品技術要求。
(1) Inspection shall be conducted before installation, and its sealing performance shall meet the technical requirements of the product.
(2)安裝時,閥門上箭頭標志方向與沖擊波的方向一致。
(2) During installation, the direction of arrow mark on the valve is consistent with the direction of shock wave.
(3)開關指示燈的位置與閥門板的實際開關位置應相同,啟閉手柄的操作位置應準確。
(3) The position of the switch indicator light shall be the same as the actual switch position of the valve plate, and the operation position of the opening and closing handle shall be accurate.
(4)閥門應用吊鉤或支架固定。
(4) The valve shall be fixed by hook or bracket.
5、測壓裝置安裝,應符合下列規(guī)定
5. The installation of pressure measuring device shall meet the following requirements
(1)測壓管連接應采用焊接,并應滿焊、不漏氣。
(1) The piezometric pipe shall be connected by welding and shall be fully welded without air leakage.
(2)管路閥門與配件連接應嚴密。
(2) The connection between pipeline valve and accessories shall be tight.
(3)測壓板應做防腐處理和膨脹螺絲固定。
(3) The pressure plate shall be treated with anti-corrosion and fixed with expansion screws.
(4)測壓儀器應保持水平安置。
(4) The pressure measuring instrument shall be placed horizontally.
以上是對通風管道安裝規(guī)范細則的詳細介紹,由山東通風管道友情奉獻,想了解更多請點擊官網http://rdhw.com.cn。
The above is a detailed introduction to the detailed rules and regulations for the installation of ventilation pipes. Shandong Ventilation Pipe Co., Ltd. is dedicated to you. For more information, please click the official website http://rdhw.com.cn 。