通風(fēng)管道安裝中確保的事項
發(fā)布人:http://rdhw.com.cn 發(fā)布時間:2017-06-15 16:59:50
每天開工前,舉行安裝人員開班前會,班前說話有必要講,做到每天講,事事講.
Before every day, held the installation personnel before the opening, it is necessary to speak before the class about security, do safety every day, everything about safety.
在裝置工作現(xiàn)場要劃定工作區(qū),設(shè)標(biāo)志,非工作人員不得入內(nèi).進入施工現(xiàn)場的人員,要穿戴好防護用品.工作服應(yīng)做到袖口緊、腰身緊、褲腳緊.在工作中,工作人員應(yīng)運用梯上下管子.
In the device work site to delineate the work area, set up safety signs, non staff are not allowed to enter. Personnel who enter the construction site should wear protective equipment. Work clothes should be tight, tight trousers, cuffs waist tight. In the work, the staff should use the safety ladder under the pipe.
高處工作應(yīng)當(dāng)設(shè)工作渠道或許腳手架,工作渠道、腳手架各節(jié)點的連接有必要結(jié)實、牢靠.工作渠道寬度應(yīng)滿意施工請求,在渠道規(guī)模內(nèi)應(yīng)鋪滿、鋪穩(wěn)腳手板.工作渠道、腳手架在運用中應(yīng)設(shè)專人隨時查看,發(fā)現(xiàn)變形、位移應(yīng)及時采取措施并承認(rèn).一般排風(fēng)機體系和空調(diào)體系的裝置,要在建筑物圍護結(jié)構(gòu)施工完,障礙物已整理,地面無雜物的條件下進行.
High work should set up work channels may scaffolding, scaffolding work channels, each node connected with strong and reliable work. The necessary channel width should be satisfied with the request of construction safety, in the channel with internal stability, the scale of Pu scaffold. The channels, the scaffold should be set up to check in the application, found that the deformation and displacement should be promptly taken to safety safety measures and admit. Device exhaust fan system and air conditioning system in the building envelope, to complete the construction, the obstacles have been collated, no debris ground conditions.
工作地址要有相應(yīng)的輔佐設(shè)施,如梯子、架子、防護、消防器材,并有施工員的技能、質(zhì)量、交底.
The work address should be provided with corresponding auxiliary facilities, such as ladders, shelves, safety protection, fire fighting equipment, and the skills, quality and safety of the builder
在通風(fēng)管道裝置中,有必要留意電氣,配電箱、開關(guān)箱有必要防雨、防塵,實施專人辦理和運用,電氣接線與撤除有必要由電工操作,非人員不得進行接線等配電工作.
In the ventilation duct device, it is necessary to pay attention to electrical safety, power distribution box and switch box is necessary to waterproof and dustproof design, implementation of special management and use of electrical wiring and removal is necessary by the electrician, non professional personnel shall carry out wiring distribution work.
開關(guān)箱的裝備和接線應(yīng)與分配電箱及配電線路相適應(yīng),箱內(nèi)電器應(yīng)裝置在金屬或非木質(zhì)的絕緣板上.開關(guān)箱的開關(guān)電器有必要在任何情況下都可以運用電設(shè)備實施電源阻隔.施工現(xiàn)場運用的移動燈具和電動工具有必要運用橡皮電纜,而且不得破皮和絕緣老化.指定用電責(zé)任人,及時發(fā)現(xiàn)和處理用電隱患,杜絕用電事故.
Equipment and wiring switch box should be matched with the power distribution box and distribution line box should be installed in the electrical insulating plate of metal or non wood on the switch. The electrical switch box is necessary in any case can use electric equipment to implement power barrier. Using mobile light construction site and it is necessary to use electric tools the rubber cables, and may not break the skin and aging. The specified electrical safety responsibility, timely detection and treatment of electrical safety hazards, prevent electrical accidents.
上一篇:黑白鐵加工在廚房設(shè)施上有哪些應(yīng)用?
下一篇:修補通風(fēng)管道損傷有哪些特點?
相關(guān)